In the November 2021 meeting NHPC appointed Jessop and Cook as architects for the new Louie Memorial Pavilion.
Condition Reports
EPC reports May 2021
In May Energy Performance Certificate inspections took place and reports have been supplied giving the Pavilion an EPC rating of B and the former Scout Hut an EPC rating of G. The G rating for the former Scout Hut means NHPC as landlord cannot grant a tenancy to new or existing tenants, unless an exemption has been registered. The full reports and certificate can be found below:
- Pavilion EPC Certificate
- Pavilion EPC Recommendation Report
- Former Scout Hut EPC Certificate
- Former Scout Hut EPC Recommendation Report
Scout Hut Condition Report 31st May 2021
An informal NHPC report was supplied by Cllr Blase in his role of Parish Councillor (not in a
professional capacity) with accompanying photos. These were presented at the 24th June 2021 Parish Council meeting. View the report and photos below:
- Scout Hut condition report 31 May 2021
- Scout Hut photos May 2021
In response to requests, NHPC has created a webpage- Scout hut lease background where you can see a timeline and access documentation of previous decisions taken by Council in relation to a lease agreement with the 4th Oxford Scouts.
Planning Application documents
Existing plans:
- Site plan – existing, 1 to 1000
- Block plan – existing buildings, 1 to 250
- Existing buildings plan, 1 to 50
- Elevations, existing buildings, 1 to 50
- Roof plans, existing buildings, 1 to 50
Approved plans:
- Building & surroundings plan
- Block plan – proposed, 1 to 250
- Unfolded elevations as proposed
- True elevations as proposed
- Roof plan as proposed, 1 to 100
- Indicative sections
- Hard & soft landscaping plans
- Hard & soft landscaping notes
- Vehicle Tracking Plans
Planning documents:
- Full planning application form
- Planning application cover letter
- Site validation checklist
- Design & Access Statement
- Drawings schedule
Previous Documents
- Ecological survey – November 2018
- Parish update leaflet of rejuvenation plans – September 2018
- Draft business plan by Nortoft – June 2018
- Public consultation report by Nortoft – June 2018
- Raw consultation survey results – May 2018
- Consultation presentation slides – April 2018
- Video extracts from the consultation presentation and questions available on our Facebook page
- Consultation presentation at Annual Parish Meeting – March 2018
- Presentation by Nortoft to R&A Committee – January 2018
An article in the March 2018 edition of the Sprout outlined the recent history.
Nortoft were appointed in December 2017 following competitive tender in response to a consultants’ brief written jointly by representatives of NHPC, the 4th Oxford Scouts, Louie Memorial Pavilion Trustees, and leisure officers Vale District Council.